Mike Moore, guest of The Power of Design Podcast

Mike Moore

Owner

M C Moore Construction

Episode 109

Building with Strategy and Clarity With Mike Moore

Subscribe and listen

Introduction

Mike Moore, owner of M C Moore Construction, sits down with Jack Ossa on The Power of Design Podcast. The two have worked together on several projects, and their conversation reads like a guide to how an architect and a general contractor can make a small commercial project go smoothly.

Mike explains how his years at a large national contractor shaped his planning habits, why he prefers detailed budgets and honest communication, and how he thinks about the relationship between the design team, the owner and the builder.

About the Episode

Mike grew up near Pittsburgh and was fascinated by construction from childhood. He studied construction management at UNC Charlotte, graduated in 2010 in a weak economy and spent seven years with a large national contractor building projects in the Carolinas and across the country, including work in data centers where downtime is costly. He then started his own company, focusing on commercial clients such as restaurants and small office upfits that did not have the budget for a big general contractor's overhead but benefited from the same planning discipline.

He and Jack compare residential and commercial work. They agree that complete drawings, early selections and permits that match the schedule prevent delays. Mike describes how his team walks every project before bidding, includes unknowns to reduce change orders, and writes detailed clarifications so owners can level bids. He explains how work reaches him mostly through architects, developers and brokers, and how a typical project moves from letters of intent and long-lead submittals to weekly reports and coordination meetings.

They also discuss Procore and Revit as industry-standard tools, the last-weeks rush before occupancy, the balance between work and family, and Jack's view that design-build collaboration should start earlier in the United States. Mike's ten-year hope is to step out of the day-to-day and mentor a new generation.

Key Takeaways

  • Plan before you build: extra time on coordination and design up front lets construction run faster and with fewer surprises.
  • Finish the selections early: a schedule is already late when finishes or materials are still marked TBD on site.
  • Compare scopes, not only numbers: bid leveling shows what each contractor includes, such as permits, so a low number does not hide gaps.
  • Budget for contingency: planning 5 to 15 percent for unknowns protects the owner, especially in existing buildings and when a lender is involved.
  • Overcommunicate the bad news: problems can be planned around if the team knows early, because delays cost more when they are hidden.
  • Use the right tools: shared software and daily photos let owners and architects catch problems remotely and early.
  • Design the team too: the project architect, superintendent and project engineer define how a project goes more than company names do.

Highlights from the Conversation

I try to overcommunicate. I think communication is key with any team.

Mike Moore

The good is great, but I can plan for the bad if I know about it.

Mike Moore

Designing the team I feel like is almost just as important as designing the building.

Mike Moore

Topics Discussed

  • Moving from a large national contractor to a small commercial firm
  • Residential versus commercial construction
  • Complete drawings, selections and permits
  • Detailed bids, clarifications and bid leveling
  • Contingency in project budgets
  • Procore, photos and weekly reports
  • Finishing a project on schedule
  • Work, family and training the next generation

Why This Conversation Matters

For owners planning a restaurant, office or other commercial space, this episode explains what protects a budget and a schedule: complete information, honest numbers and a team that communicates. Our interior architecture process aims for the same clarity from the first drawing, as in Bentley's Restaurant and Architech Sports. A design team that works closely with the builder from early on also helps projects like these reach the finish line without surprises.

About the Guest

Mike Moore is the founder and owner of M C Moore Construction, a commercial general contractor that works within about an hour and a half of Charlotte. He grew up near Pittsburgh, earned a construction management degree at UNC Charlotte in 2010, and spent seven years at a large national contractor before starting his own company.

Connect with Mike Moore on LinkedIn | Visit M C Moore Construction

Frequently Asked Questions

How did Mike Moore start M C Moore Construction?

Mike grew up near Pittsburgh, earned a construction management degree at UNC Charlotte, graduated in 2010 and spent seven years with a large national contractor. He then started his own company to bring that planning and process to smaller clients, such as restaurants and small office upfits, who often lacked contractors offering that level of service.

Why does Mike recommend complete drawings and early decisions?

He says schedules are shrinking, and when finishes or stone are still marked TBD during construction, the project is already behind. Spending more time on coordination and design before building starts lets the team execute faster and avoids surprises for the client.

What is bid leveling and why does it matter?

Bid leveling is comparing contractor bids on the same scope. Mike says outliers often hide gaps, for example a low bid that excluded the permit, so his proposals include detailed clarifications to let the owner or architect compare what each contractor includes and excludes.

Why should every project budget include contingency?

Mike and Jack both say contingency of roughly 5 to 15 percent should be planned, especially in existing spaces, because inspectors, unforeseen conditions and owner changes will appear. If funding comes from a bank, it is easier to include it up front than to request another loan later.

How does Mike manage communication and technology during a project?

He says he tries to overcommunicate, including bad news, so that problems can be planned for. His team uses Procore, which is free to architects, subcontractors and owners, along with daily photos, weekly reports and coordination meetings with subcontractors and the owner.