Three ways to deliver a commercial project
| Method | Who you sign with | What it tends to do well | What to watch |
|---|---|---|---|
| Design-bid-build | An architect first, then a general contractor after the design is done. | You control the design and can compare contractors on the same drawings. | The price is known late, so pricing checks during design are important. |
| Design-build | One firm responsible for design and construction. | One point of responsibility, with design and construction moving together. | Less independent oversight, so be clear who speaks for the owner. |
| Contractor during design | An architect, plus a contractor who joins before the design is finished. | Pricing and construction advice while the design can still change. | Ask how the contractor is selected and how the price is checked. |
These are general descriptions. The details of each contract change who carries which risks, so have your attorney and insurer review them.
What does not change
Whichever method you choose, the same work has to happen: a clear program, a budget, a design coordinated with the engineers, a permit and construction. In Mecklenburg County the permit review is the same, as we explain in our guide to commercial tenant upfit permits.
Questions to ask any firm
- Who is accountable for the design and who for the price?
- When is the first pricing check? The sooner the design is tested against the budget, the more options you have.
- What happens if the price is above the budget? Ask for a clear process: what gets simplified, phased or deferred.
- Who speaks for you during construction? Someone should review submittals, answer field questions and walk the site.
- How are changes handled? Ask how a change in scope is priced, approved and recorded.
- Can the work be phased? Many businesses cannot stop operating while they build.
An example: Melmark Carolinas
Melmark Carolinas turned an existing office building in Charlotte into a 22,470 SF school. We provided architecture, engineering coordination, permitting and construction administration, and the general contractor was Swinerton. Construction documents were issued in October 2022 and construction administration ran through 2023. It is a good example of an architect leading the design team and working beside the builder.
How to decide
If you want the most control over the design and a side-by-side comparison of contractors, design-bid-build with pricing checks during design fits. If you want a single point of responsibility, design-build may fit, as long as someone speaks for you. If you want construction advice early, a contractor who joins during design can help.
To talk through your project, read about our commercial interior design services or contact the studio.